info@od-craft.com+20 151 596 1393 Arabic
Home Method

The OD Craft Method

Four stages. Your sign-off at each one.

Every engagement follows the same four stages, named in the craft vocabulary. No stage starts before the previous gate is signed, so you always know what you have approved and what comes next.

  1. STAGE 01MeasureOrganizational diagnosisGATEDiagnostic report and agreed findings
  2. STAGE 02BlueprintStructure or system designGATEApproved blueprint
  3. STAGE 03BuildImplementation in your toolsGATEWorking system, accepted by you
  4. STAGE 04GaugeCalibration and handoverGATECalibration report and signed handover
01

MeasureOrganizational diagnosis

We measure before we design: structure, roles, workload, performance data and the way decisions are actually made. Interviews, data and documents are checked against each other until the facts are agreed.

Gate

Diagnostic report and agreed findings

02

BlueprintStructure or system design

We design the target structure or system with options, trade-offs and the rules that make it work. Nothing is built until you approve the blueprint.

Gate

Approved blueprint

03

BuildImplementation in your tools

We build the system inside your own Excel or HRIS, in English and Arabic: job descriptions, KPI libraries, forms, policies and tools your team can run without us.

Gate

Working system, accepted by you

04

GaugeCalibration and handover

We run the first cycle with you, calibrate what the data shows and hand over only when the system runs without us.

Gate

Calibration report and signed handover

Quality standards in every engagement

Your tools, not ours

Systems run in your own Excel or HRIS. No new software is required.

Two languages

Every deliverable is produced in Arabic and English.

Two reviewers

Two people review every deliverable before it reaches you.

Start with Measure

Build a structure that can carry your next stage of growth.